CUSTOMER: EL BULLI FOUNDATION
ACTIVITY SECTOR: Tourist
LOCATION: Cala Montjoi, Roses (Girona)
BASIC INFORMATION ABOUT THE PROJECT:
Wastewater treatment plant with membrane bioreactor system that obtains reclaimed wastewater for irrigation.
TREATMENT FLOWRATE: 50 m3/day
PROCESS STAGES:
WATER LINE
- INITIAL PUMPING
- AUTHOMATIC SCREEN
- ANOXIC TANK
- BIOLOGICAL REACTOR
- MEMBRANE SEPARATION