corpi

corpi

Menu

CUSTOMER:                   EL BULLI FOUNDATION

ACTIVITY SECTOR:           Tourist
LOCATION:                     Cala Montjoi, Roses (Girona)

BASIC INFORMATION ABOUT THE PROJECT:     
Wastewater treatment plant with membrane bioreactor system that obtains reclaimed wastewater for irrigation.

TREATMENT FLOWRATE:             50 m3/day

PROCESS STAGES:

WATER LINE

  • INITIAL PUMPING
  • AUTHOMATIC SCREEN
  • ANOXIC TANK 
  • BIOLOGICAL REACTOR 
  • MEMBRANE SEPARATION