Integrated in the water supply system of the North Costa Brava Reduction of the organic matter present in the catchment waters to minimize the formation of tri-halo-methanes due to chlorination…
Integrated in the water supply system of the North Costa Brava Reduction of the organic matter present in the catchment waters to minimize the formation of tri-halo-methanes due to chlorination…
Can Mir 08019 Rubí Built surface 1,270.66 m2 Demolition of pre-existing structures, surface foundation, metal structure, metal cover with perimeter sill, concrete floor, drainage and lighting installations.
Work intended for the reception of cleaning trucks in a solids emptying and decanting tank. Floatting is discharged into the internal sewer network, after passing through a sieve. The leachate..