Skip to content

Case studies

Real challenges, measurable results.

Every wastewater is different, and every client has its own needs. These are some of the projects we have designed, built and commissioned for the food industry, the meat sector and tourism: what the challenge was, the solution we applied and the results achieved.

Càrnica Batallé 01
Sector
Meat
Location
Riudarenes (Girona)
Year
2025
Flow
400 m³/day
MBR

Càrnica Batallé

From DAF flotation to a membrane bioreactor.

Càrnica Batallé, a leading pig producer founded in 1920, needed more capacity at the treatment plant Corpi was already operating. The DAF used for biomass separation was at its hydraulic limit and could not run above 3.5 g/L MLSS.

Objective

Treat a higher flow than the DAF could handle and operate at 6 g/L MLSS to ensure stable nitrification and denitrification and high-quality effluent for discharge.

Solution

Conversion to MBR within the existing infrastructure: a 1 mm automatic rotary screen, the DAF repurposed as a degreaser, the homogenisation tank turned into an anoxic reactor and a new ultrafiltration tank with 2 PURON PULSION LE16-16 modules. Completed in February 2025.

Key results

  • SS < 30 mg/L; BOD, TKN and N-NO₃ < 5 mg/L
  • Stable biomass at 6 g/L MLSS
  • Upgrade using the existing tanks
  • Reliable discharge to public waterways
Sandaya Cypsela Resort 02
Sector
Tourism
Location
Girona
Year
2025
Flow
975 m³/day
MBR · Reuse

Sandaya Cypsela Resort

MBR retrofit to reuse the water for irrigation.

Sandaya Cypsela Resort, a campsite run by the Sandaya group, expanded its number of bungalows. With the extra load, the biological reactor of the conventional treatment plant could no longer ensure full nitrification and denitrification.

Objective

Produce ultrafiltered effluent suitable for irrigating the resort's gardens, in line with Spanish Royal Decree 1085/2024 on water reuse.

Solution

Conversion of the plant into a membrane bioreactor: the secondary clarifier became an anoxic tank and a membrane tank was added with 3 PURON PULSION LE16-16 modules (2,088 m² of membrane). In operation since April 2025.

Key results

  • Reclaimed water for irrigation (RD 1085/2024)
  • Existing tanks reused
  • Stable operation in peak season
  • Lower mains water consumption
Frigorífics Costa Brava 03
Sector
Meat
Location
Riudellots de la Selva (Girona)
Year
2020
Flow
400 m³/day
MBR

Frigorífics Costa Brava

MBR membrane retrofit: +50% capacity.

Costa Brava Mediterranean Foods (Grup Cañigueral) treats the wastewater from its cutting room with an MBR. The original hollow-fibre membranes were limiting the plant's capacity and performance.

Objective

Increase capacity and water quality without new civil works, to discharge reliably to public waterways and allow the water to be reused in the future.

Solution

Replacement of the membranes with 2 PURON PULSION LE16-16 modules (1,392 m² in total), sized for an average 400 m³/day and 26 m³/h peaks, in the same space as the previous system.

Key results

  • +50% capacity in the same footprint
  • Permeate suspended solids < 1 mg/L
  • Water fit for discharge and reuse
  • No new civil works
Delafruit 04
Sector
Beverages and food
Location
La Selva del Camp (Tarragona)
Year
2021
Flow
800 m³/day
DAF

Delafruit

Biomass separation by flotation.

Delafruit makes baby food, juices, smoothies and organic food. The factory's growth overloaded the existing SBR plant, and the biomass suffered from bulking due to a lack of nutrients, which made settling difficult.

Objective

Increase treatment capacity to reliably meet the discharge limits for public waterways.

Solution

Design, construction and commissioning of a conventional activated sludge system with biomass separation by DAF flotation, which effectively separates bulking sludge.

Key results

  • COD from 1,600 to < 100 mg/L
  • SS from 300 to < 5 mg/L
  • Bulking sludge separated effectively
  • Flocculant: 10 mg/L on average
La Fageda 05
Sector
Dairy
Location
Santa Pau (Girona)
Year
2019
Flow
600 m³/day
CAF · Activated sludge

La Fageda

A complete treatment plant inside a natural park.

La Fageda, a social enterprise that makes yoghurts, ice cream and jams, had outgrown its treatment plant. The factory is also inside a natural park, where discharged water is subject to stricter control.

Objective

Treat the factory's new flow with effluent quality fit for an area of high environmental protection.

Solution

Complete plant. Water line: automatic screening, physico-chemical treatment with CAF flotation and activated sludge with flotation clarification. Sludge line: aerobic digestion and centrifuge dewatering.

Key results

  • COD from 3,000 to < 80 mg/L
  • Oils and fats from 250 to < 10 mg/L
  • SS from 500 to < 20 mg/L
  • Biomass at 8,000 mg/L MLSS
Reixach Slaughterhouse 06
Sector
Meat
Location
Hostalric
Year
2018
Flow
700 m³/day
DAF

Reixach Slaughterhouse

A complete treatment plant for a pig slaughterhouse.

A pig slaughterhouse with cutting and packing. Its wastewater carries very high loads of organic matter and solids, and the company paid a fee to the industrial estate's treatment plant based on flow and pollution discharged.

Objective

Reduce the pollution discharged, and with it the fee, and handle the high sludge production by reducing its volume.

Solution

Complete plant: automatic screening, a 1,000 m³ equalisation and aeration tank, coagulant and flocculant dosing and clarification in a circular DAF. Sludge is stored and dewatered by centrifuge.

Key results

  • COD from 5,000 to < 300 mg/L
  • SS from 3,000 to < 50 mg/L
  • Lower discharge fee
  • Less sludge to dispose of
Patatas Torres 07
Sector
Food
Location
Montmeló (Barcelona)
Year
2017
Flow
50 m³/day
Physico-chemical · DAF

Patatas Torres

Physico-chemical treatment and flotation for a crisp factory.

Patatas Torres makes potato crisps and fried vegetables. Its wastewater carries organic matter and potato peel, and the plant at the old factory suffered from uncontrolled flotation in the clarifier.

Objective

Separate the solids reliably, without the clarifier problems, in the new factory's treatment plant.

Solution

Design, construction and commissioning of the complete plant: a stirred and aerated equalisation tank, physico-chemical treatment with coagulant and flocculant and solids separation by circular DAF flotation.

Key results

  • COD from 2,500 to < 100 mg/L
  • SS from 800 to < 15 mg/L
  • No uncontrolled flotation
  • Low chemical doses
El Zamorano 08
Sector
Agri-food
Location
Mercabarna (Barcelona)
Flow
70 m³/h
Technology
Physico-chemical · Reuse
Physico-chemical · Reuse

El Zamorano

Reusing 100% of the process water.

A potato and onion distributor. Washing the produce and cleaning the facilities used large amounts of water, and reusing it untreated was not an option: it exceeded discharge limits and dirtied the facilities.

Objective

Recover the washing water and return it to the process with the quality required by RD 1620/2007 for the food industry, in the smallest possible space.

Solution

A fully automatic 70 m³/h plant in 50 m²: 1 mm screening, chemicals approved for drinking water, settling and polishing settling, and final chlorination. Sludge is dewatered with liquid lime in an automatic filter press.

Key results

  • 100% of the treated water reused
  • TSS < 10 ppm; E. coli < 100 cfu/100 mL
  • Payback in under two years
  • All in just 50 m²

Contact

Let's talk about your project.

Tell us what you need and we will get back to you with a proposal.

Privacy Overview
Corpi

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.