Skip to content
All news

Award of the new wastewater treatment plant for the Noel central facility, meat processing sector.

The CORPI Group has been selected to develop the new wastewater treatment plant at NOEL’s main production site in Sant Joan les Fonts, where the main activities include meat cutting and the production of cooked ham and “fuet” sausages.

The project involves a full-scale renovation that CORPI will carry out entirely as a turnkey project.

The new project includes the construction of all tanks in reinforced concrete (homogenization, anoxic reactor, biological reactor, sludge storage), as well as the complementary buildings, the design and installation of all treatment equipment, and the commissioning of the treatment plant until the treated water meets the required quality standards.

The plant is designed for a future flow rate of 1.000 m³/day, and the selected technology for biomass separation is submerged ultrafiltration membrane filtration.

The stages of the water line are:

  • Screening.
  • Aerated homogenization.
  • Physicochemical treatment and DAF flotation.
  • Biological treatment with nitrification and denitrification.
  • Biomass separation using membrane technology (MBR).

The stages of the sludge line are:

  • Sludge storage.
  • Dewatering using a screw press.

The wastewater treatment plant is scheduled to be operational before August 2025.

Share LinkedInWhatsAppEmail

Contact

Let's talk about your project.

Tell us what you need and we will get back to you with a proposal.

Privacy Overview
Corpi

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.