Integrated in the water supply system of the North Costa Brava

Reduction of the organic matter present in the catchment waters to minimize the formation of tri-halo-methanes due to chlorination.

Includes;

– Civil work; path arrangement (278 ml), equipment shed (40 m2) and auxiliary works in the facilities.

– Installations;

Feeding the equipment from a tap on the inlet pipe and discharge of the product by tap on the outlet pipe of the tank.

Electricity; grounding, powering the equipment. Photovoltaic production system; field 2.2 kWp, inverter, battery 15.7 kWh.

remote control; SCADA integration

Water; stainless tinsmith, emergency shower.

Forced ventilation.

– Equipment;

Preparation of permanganate from the powdered product PROMINENTE IBERIA SA 125 l/h at 1%

Control by turbidity, redox and TOC sensors

Dosing and centrifugal pumps

Level probes

Valve works