CORPI GIA has won the tender from the Consell Comarcal de Osona for the works contract for the automation of the CCM in the sludge building at the Vall del Ges WWTP. The work consisted of the following:

  • Replacement of the CCM2 sub-panel in the sludge room.
  • Interconnection with existing lines.
  • Relocation of existing installations.
  • Connection of power and signalling lines.
  • Installation of air conditioning equipment for the room.
  • Installation of raised flooring.
  • Modification of installations for access opening.
  • Removal of obsolete electrical installations.

The work was carried out in perfect coordination between Corpi Gia and Corpi Obres, resulting in another success case with the works completed within the execution period.