Supply to Besalú, with a capacity of 500 m3/day and a peak flow of 30 m3/h

 

LOT 1. Civil works and electrical branch.

 

Civil works;

 

– Building 157.04 m2

Surface foundation

Metal structure, with EI-30 fire protection

Sandwich panel roof

Block wall enclosure

Concrete floor

Metal carpentry

Sanitation, electricity and tinsmithing installations for general services.

 

– Adaptation of the plot 1,164.84 m2

Clearing

Soil works

Sanitation

Installation ducting

Concrete subbases and floors

Perimeter fence with access doors

Electrical branch;

– Branching in high, with pole replacement.

– 100kVA transformer, with prefabricated module and connection cells.

– Power supply in low to CGP