CORPI SL has completed the construction works of the Industrial Building for the manufacture of metal structures for Culleré I Sala SL, with Project and Management of EGAVIC, at the pole Pla de Llevant, in Polinyà.
The surface of the plot is 1,149 m2, with a built-up floor of 712.20 m2, plus 115.45 m2 of loft.
The works have consisted of;
– Digging; clearing, removal, excavation of ditches and wells, compactions and sub-bases.
– Foundation; pilings, braces, retaining wall.
– Sanitation; fecal and rainwater. Horizontal and vertical network.
– Metal structure.
– Metal cover.
– Closure; metal facade and prefabricated concrete panels, aluminum carpentry.
– Concrete floors, interior and exterior.
– Interior partitions, partitions and finishes for offices and dressing rooms.
– Elements of locksmithing in closing the plot.
Culleré i Sala SL has executed the metal structure, roof and metal facade.
Recent Comments