CORPI SL has completed the Consolidation work on the renovation of dressing rooms in the DABLAN-97 warehouse in Gavà, with Project and Management by Martí Santaularia, industrial engineer.

The works are divided into two phases;

– SLAB CONSOLIDATION. End of June 2023.

The existing floor had very serious settlements, up to 30 cm deep.

The repair must be simultaneous with the industrial activity of the occupant, under a rental regime.

The renovated surface is 3,438 m2

The corrective measures have consisted of;

  • Isolation of the work area; Sandwich panel partition at a height of 10.00 m
  • Floor demolition.
  • Leveling of the base, with the addition of gravel material.
  • Perforation of injected micro-pilot, up to 8,404 ml
  • New floor; micro-piles punching caps, vapor barrier, double-layer reinforcement, structural joints, concreting of the slab and plastered finish.

 

– RENOVATION OF DRESSING ROOMS. End of December 2023.

Restrooms and changing rooms on the ground floor are being renovated, corresponding to the use of productive staff and the reception area in the offices.

The renovated surface is 274 m2

The works have consisted of;

  • Interior demolition.
  • New sanitation network.
  • Renovation of plumbing, electricity and ventilation facilities.
  • Renovation of floors and masonry finishes.
  • Partitions; partitions and flush ceiling.
  • Finishes; leather goods, epoxy resin coatings, carpentry, paint, sanitary ware and accessories, sanitary cubicles.